Accident Year12m24m36mLatest AgeUltimateIBNR
AY1
36m€22 050 000€1 050 000
AY2
24m€20 475 000€3 475 000
AY3
12m€21 877 397€8 877 397
Weighted 12->24 Factor
1.3973
Weighted 24->36 Factor
1.1471
CDF 12->Ultimate
1.6829
Selected Tail Factor

Latest-to-Ultimate CDF

1.2628

=

Projected Ultimate Claims

€64 402 397

÷

Latest Cumulative Claims

€51 000 000

Projected Ultimate Claims

€64 402 397

=

Latest Cumulative Claims

€51 000 000

×

Latest-to-Ultimate CDF

1.2628

Indicated IBNR Reserve

€13 402 397

=

AY1 IBNR

€1 050 000

+

AY2 IBNR

€3 475 000

+

AY3 IBNR

€8 877 397

1Step 1

Derive weighted age-to-age development factors

f12,24=AY24mAY12m,f24,36=AY36mAY24mf_{12,24} = \frac{\sum AY_{24m}}{\sum AY_{12m}},\qquad f_{24,36} = \frac{\sum AY_{36m}}{\sum AY_{24m}}
2Step 2

Build selected cumulative development factors to ultimate

CDF12=f12,24×f24,36×Tail,CDF24=f24,36×Tail,CDF36=TailCDF_{12} = f_{12,24} \times f_{24,36} \times Tail,\quad CDF_{24}=f_{24,36}\times Tail,\quad CDF_{36}=Tail
3Step 3

Project each accident year from the latest diagonal

UltimateAY=LatestCumulativeAY×CDFlatestUltimate_{AY} = LatestCumulative_{AY} \times CDF_{latest}
4Step 4

Calculate indicated IBNR reserve

IBNR=AYmax(0,  UltimateAYLatestCumulativeAY)IBNR = \sum_{AY}\max(0,\;Ultimate_{AY} - LatestCumulative_{AY})

Understand the Claims Development Triangle

Overview

This calculator provides an atomistic claims-development triangle calculator for technical-provisions diagnostics.[1][2] It derives weighted development factors, selected cumulative development factors, projected ultimate claims, and indicated IBNR from cumulative claims inputs.

Input Terms

  • Cumulative Claims by Accident Year and Development Age: Three accident years with cumulative values at 12, 24, and 36 months.
  • Tail Factor: Selected factor to project from 36 months to ultimate.

Technical Rationale

The calculator first computes weighted development factors from 12->24 and 24->36, then derives cumulative development factors from 12/24/36 months to ultimate using the selected tail factor. It projects AY-level ultimate claims from the latest selected maturity points and computes AY-level indicated IBNR as projected ultimate minus latest cumulative claims. The outputs include total latest cumulative claims, total projected ultimate claims, and total indicated IBNR.

Important Notes

  • Atomistic scope only: This calculator does not perform reserve-policy decisions or governance actions itself.
  • Input discipline: Cumulative claims should be provided consistently on a like-for-like basis across accident years.
  • Downstream use: The indicated IBNR output is designed to feed reserve-adequacy diagnostics.

Sources

  1. Directive 2009/138/EC - Art. 77 (Calculation of technical provisions) - EIOPA
  2. Directive 2009/138/EC - Art. 82 (Data quality) - EIOPA

Default values are illustrative sample inputs for navigation, training, and QA. Replace them with controlled data before using the result in capital analysis, governance, or reporting decisions.